Water Supply Works
OngoingPaani ka kaam
Multiple storage tanks at mountain level, pipelines down to the village, borewells, and the reconstruction and safeguarding of tanks already standing. The single largest head of development spending.
Prototype|Sample figures. Nothing here is a live record yet.
www.pewe-sws.org
Gaon ke kaam — poora kaagaz ke saath
No work above one lakh is awarded on fewer than three written quotations, opened before the committee. The comparison sheet is published here — including the quotations that lost, and why.
Ab tak kya bana
The record of works finished or still running since 2015. Costs are the office's own approximations until the audited statements are in.
Paani ka kaam
Multiple storage tanks at mountain level, pipelines down to the village, borewells, and the reconstruction and safeguarding of tanks already standing. The single largest head of development spending.
Imarat ki marammat
Structural repair, plastering, boundary walls and ongoing maintenance of the village's community structure.
Sadak ka kaam
Internal village roads and the approach stretches, laid and repaired in phases.
Street light
Street lights along the village lanes and the approach road, put up and maintained by the Society.
Compound wall
Boundary walls at several village sites, including the burial ground on the north and west faces.
Kuan safai
Reviving old wells that had gone out of use, and periodic cleaning of those still drawn from.
Gaon ki safai
Grass clearing, walkway upkeep and general cleaning through the year — the unglamorous work that keeps the village usable in the monsoon.
Abhi ke kaam
Each one with its budget, its milestones, and every quotation received — including the ones that lost.
गाव पिण्याचे पाणी योजना
A further 20,000-litre tank at mountain level, one new borewell behind the school, and a gravity distribution line covering Madhli Aali, Bazarpeth and Naka. Land cleared by Gram Panchayat resolution dated 12 May 2026.
3 received and opened before the committee.
| Vendor | Place | Amount | Received | Document | Committee note | Selected |
|---|---|---|---|---|---|---|
| Sahyadri Borewells | Chiplun | ₹17,95,000 | 4 May 2026 | sahyadri-borewells-quote.pdf | Lowest of three. Agreed to stage payment against milestones. | Awarded |
| Konkan Aqua Works | Ratnagiri | ₹19,12,000 | 6 May 2026 | konkan-aqua-quote.pdf | — | — |
| Vishwas Drilling & Pipes | Guhagar | ₹20,40,000 | 7 May 2026 | vishwas-drilling-quote.pdf | Includes 2-year AMC; committee felt AMC could be tendered separately. | — |
New profiled sheeting on treated rafters over the upper hall, re-plastering of the arcade band and the pierced screens, and repainting in the original ochre and cream.
3 received and opened before the committee.
| Vendor | Place | Amount | Received | Document | Committee note | Selected |
|---|---|---|---|---|---|---|
| Rajapur Roofing Co. | Rajapur | ₹9,05,000 | 2 Aug 2026 | rajapur-roofing-quote.pdf | — | — |
| M. A. Mestry & Sons | Guhagar | ₹9,28,000 | 9 Aug 2026 | ma-mestry-quote.pdf | Local firm. Did the compound wall in 2019 to satisfaction. | — |
| Deccan Fabricators | Chiplun | ₹10,10,000 | 21 Aug 2026 | deccan-fabricators-quote.pdf | — | — |
Two classrooms and a four-unit girls' toilet block, with a water connection taken from the new village scheme.
1 received. The committee will not open a comparison until three are in hand.
| Vendor | Place | Amount | Received | Document | Committee note | Selected |
|---|---|---|---|---|---|---|
| Guhagar Construction | Guhagar | ₹13,85,000 | 25 Aug 2026 | guhagar-construction-quote.pdf | — | — |
340 running feet of laterite block wall on the north and west sides, with a steel gate matching the compound.
3 received and opened before the committee.
| Vendor | Place | Amount | Received | Document | Committee note | Selected |
|---|---|---|---|---|---|---|
| M. A. Mestry & Sons | Guhagar | ₹4,52,000 | 18 Nov 2025 | ma-mestry-boundary.pdf | — | Awarded |
| Palshet Laterite | Palshet | ₹4,68,000 | 20 Nov 2025 | palshet-laterite.pdf | — | — |
| Deccan Fabricators | Chiplun | ₹5,11,000 | 22 Nov 2025 | deccan-boundary.pdf | — | — |
Eighteen solar street lights along the 2.4 km stretch between the village and the Guhagar road junction, unlit since the line was cut in 2024.
None received yet. The work has not gone out to quotation.
A shared vehicle for the Ratnagiri and Chiplun hospital runs, presently arranged privately at high cost by each family.
None received yet. The work has not gone out to quotation.